Bridge girders

Figures 11 and 12, below, are photographs of the bridge taken from the south and north banks of the firth.

The girders of the bridge were supported on a total of 85 piers. The first 14 piers were made from brick and masonry, built up as a solid structure. The rest were fabricated from iron on masonry platforms, and by comparison, appeared rather insubstantial (Figure 11). Over most of the bridge, the track ran on top of the girders (Figure 12).

Figure 11
(St Andrew's University Library) ©
St Andrew's University Library
Figure 11 View of the bridge from the south bank of the firth, looking north
Figure 12
(St Andrew's University Library) ©
St Andrew's University Library
Figure 12 View of the bridge from the north bank of the firth, looking south

But between piers 28 and 41 the construction was different. This was the place where the navigation channel lay, and where the bridge had to have the full headroom of 88 feet. To achieve the extra height, the piers were extended to bring their tops up to the level of the tracks.

Thirteen spans of lattice-work box section were then placed end-to-end on top of the piers, and the track was carried on the floor of the box (Figure 13). The thirteen spans, the high girders, can be seen clearly in Figure 12.

Figure 13
(St Andrew's University Library) ©
St Andrew's University Library
Figure 13 Locomotive inside the high girders

Made from wrought iron sections riveted together, a single 245-foot span weighed about 230 tons complete with track and wooden decking. As shown in Figure 10, the individual spans in the high girders were joined together into three continuous lengths, one of five spans, the two of four spans. The high girders were fixed at only three points to the piers (labelled F in the figure), roller bearings at the other piers allowed for thermal expansion and contraction.

The track was single, laid to the standard gauge of 56.5 inches and fitted with railings on the approach to the high girders. They would not have prevented the train toppling over the edge if it had derailed, however. A passenger would have felt more secure once the train had entered the high girders, although some complained about the drumming noise the open latticework set up as the carriages passed.

Figure 14 shows the side and end elevations of a 245-foot span from the high girders. The main dimensions are given in the Board of Trade (BoT) enquiry report, and details have been estimated from photographs taken for the enquiry.

Figure 14
(From Engineering Materials 3, Materials Failure Analysis. Butterworth Heinemann.) ©
From Engineering Materials 3, Materials Failure Analysis. Butterworth Heinemann.
Figure 14 Simplified elevation of a span of the high girders
TAY_1

Take your learning further

Making the decision to study can be a big step, which is why you'll want a trusted University. The Open University has over 40 years’ experience delivering flexible learning and 170,000 students are studying with us right now. Take a look at all Open University courses.

If you are new to university level study, find out more about the types of qualifications we offer, including our entry level Access courses and Certificates.

Not ready for University study then browse over 900 free courses on OpenLearn and sign up to our newsletter to hear about new free courses as they are released.

Every year, thousands of students decide to study with The Open University. With over 120 qualifications, we’ve got the right course for you.

Request an Open University prospectus