Figure 5 description

The figure shows a large arrow pointing from left to right with the arrow pointing towards text that says ‘Behind schedule’. Above the arrow is a branch that is attached to the arrow. This branch has a label that says ‘Unclear what tasks were’. Coming off this branch is a sub-branch with a label that says ‘Didn’t plan tasks well’, which in turn has a sub-sub-branch that has the label ‘Didn’t break down goals to tasks’. Below the arrow are two branches; the one to the left has a label that says ‘Key component ordered late’. This branch has a sub-branch with the label ‘No one told Purchasing of deadline!’ The right-hand branch below the arrow has a label that says ‘2 team members absent at key time’. This branch has a sub-branch with a label that says ‘illness’.