Skip to main content

Week 3: Stages of team development

Completion requirements
View all sections of the document

A graph showing the S-curve of team performance. The x-axis label is Time and the y-axis label is Performance. The graph shows a diagonally stretched S. From bottom left to top right the words in the following order have been added to the S-curve: Forming, Storming, Norming, Performing, Adjourning.