Quizzes - Accessible Versions
The following quizzes are accessible for assistive screen reader technology
4. Module 3 Quiz
Select true or false for the following statements
- Air quality testing should be conducted only after ice resurfacing is completed.
- Make-up air louvres and exhaust fans should be turned on and functioning before resurfacing begins.
- Air quality testing should include both the ice pad area and the spectator seating area.
- Reviewing maintenance records and exhaust emission testing is part of an IAQ inspection.
- Baseline carbon monoxide and nitrogen dioxide levels should be measured before any resurfacing activities occur.
- Air samples at the player’s bench should be taken at breathing height, approximately 1 metre above the ice.
- Spectator area air samples should ideally be taken under a radiant heater at breathing height.
- IAQ testing steps should be repeated for each ice pad in the facility.
Click here for answer key