5.7.3 Cost
Latrine systems have to be affordable to the users. The cost is made up of two components: construction cost and operating cost. The operating cost will include the cost of pit-emptying (in the case of pit latrines) and the cost of water (for water-flushed systems). The total cost should be kept low so that most people find it affordable.
5.7.2 Construction materials